Line 3: Line 3:
 
* Project Name <blockquote>Expanding Butano Canyon Green Bin Days</blockquote>
 
* Project Name <blockquote>Expanding Butano Canyon Green Bin Days</blockquote>
 
* Project Tracking Number <blockquote>18-FP-CZU-1140</blockquote>
 
* Project Tracking Number <blockquote>18-FP-CZU-1140</blockquote>
* Project Description Summary<blockquote>We will be expanding our quarterly Green Bin days to bi-monthly days. We will be proposing funding for the purchase of a chipper and additional dumpster rentals. We will be providing in-kind labor, fuel and maintenance donations. ''ok we need text such as''Butano Canyon is a community of # homes and # common buildings, including a water treatment plant. Residing in # acres adjacent to Butano Start Park, the canyon is in a designated High Fire Risk area. </blockquote>
+
* Project Description Summary<blockquote>We will be expanding our quarterly Green Bin days to bi-monthly days. We will be proposing funding for the purchase of a chipper and additional dumpster rentals. We will be providing in-kind labor, fuel and maintenance donations. ''ok we need text such as''Butano Canyon is a community of # homes and # common buildings, including a water treatment plant. Residing in # acres adjacent to Butano Start Park, the canyon is in a designated High Fire Risk area. The Canyon has # residents who work in the surrounding community or along the southern reaches of San Mateo County. The community is a mix of permanent residents, renters, and part time occupants. This community is in a Low-Income region of San Mateo County.<BR>93 water connections, 88 houses. a drinking water treatment plant with 2 holding tanks and X feeder tanks<BR>WORK IN PROGRESS, JUST SKETCHING IDEAS</blockquote>
* Scope of work ''Only one of these in a grant need be answered.''
+
* Scope of work <span style="background:#00FF00">  ''Only one of these in a grant need be answered.''</span>
 
# Section 1: Hazardous Fuel Reduction/Removal of Dead or Dying Tree Projects  
 
# Section 1: Hazardous Fuel Reduction/Removal of Dead or Dying Tree Projects  
## Describe the geographic scope of the project, including an estimate of the number of habitable structures and the names of the general communities that will benefit.  
+
## Describe the geographic scope of the project, including an estimate of the number of habitable structures and the names of the general communities that will benefit.<blockquote><span style="background:#00FF00">The Butano Canyon Municipal Water Company serves the 88? houses comprising the Butano Canyon community. The Community is located on the banks of Butano Creek, between Butano State Park to the south and private holdings to the north. Established at the turn of the 20th century, the  community occupies about 238 ? acres of second growth Redwood forest.</span></blockquote>
## Describe the goals, objectives, and expected outcomes of the project.
+
## Describe the goals, objectives, and expected outcomes of the project.<blockquote><span style="background:#00FF00">The Goal
 
## Provide a clear rational for how the proposed project will reduce the risks associated with wildfire to habitable structures in the WUI.
 
## Provide a clear rational for how the proposed project will reduce the risks associated with wildfire to habitable structures in the WUI.
 
## Identify any additional assets at risk to wildfire that will benefit from the proposed project. These may include, but are not limited to, domestic and municipal water supplies, power lines, communication facilities and community centers.
 
## Identify any additional assets at risk to wildfire that will benefit from the proposed project. These may include, but are not limited to, domestic and municipal water supplies, power lines, communication facilities and community centers.
Line 24: Line 24:
 
## Identify specific actions being advocated in the education material that is expected to increase the preparedness of residents and structures in the WUI for wildfire.
 
## Identify specific actions being advocated in the education material that is expected to increase the preparedness of residents and structures in the WUI for wildfire.
 
## Describe the expected outcome of the education in terms of increased or changed public awareness about wildfire.
 
## Describe the expected outcome of the education in terms of increased or changed public awareness about wildfire.
 +
# B B. Relationship to Strategic Plans
 +
## Does the proposed project support the goals and objectives of the California Strategic Fire Plan, the local CAL FIRE Unit Fire Plan, a Community Wildfire Protection Plan (CWPP), County Fire Plan, or other long term planning document? (Please type in blank space below. Please note there is no space limitations).
 +
# C. Degree of Risk
 +
## Discuss the location of the project in relation to areas of moderate, high, or very high fire hazard severity zone as identified by the latest Fire and Resource Assessment Program maps. Fire hazard severity zone maps by county can be accessed at: http://www.fire.ca.gov/fire_prevention/fire_prevention_wildland_zones_maps.php
 +
## Describe the geographic proximity of the project to structures at risk to damage from wildfire in the WUI. (Please type in blank space below. Please note there is no space limitations).
 +
# D. Community Support
 +
## Does the project include any matching funds from other funding sources or any in-kind contributions that are expected to extend the impact of the proposed project?
 +
## Describe plans for external communications during the life of the project to keep the effected community informed about the goals, objectives and progress of the project. Activities such as planned press releases, project signage, community meetings, and field tours are encouraged.
 +
## Describe any plans to maintain the project after the grant period has ended.
 +
## Does the proposed project work with other organizations or agencies to address fire hazard reduction at the landscape level?
 +
# E. Project Implementation
 +
## Discuss the anticipated timeline for the project. Make sure to take seasonal restrictions into account.
 +
## Verify the expected timeframes to complete the project will fall under the March 15, 2022 deadline.
 +
## Describe the milestones that will be used to measure the progress of the project.
 +
## Describe measurable outcomes (i.e. project deliverables) that will be used to measure the project’s success.
 +
## If applicable, how will the requirements of the California Environmental Quality Act (CEQA) be met?
 +
# F. Administration
 +
## Describe any previous experience the project proponent has with similar projects. Include a list of recent past projects the proponent has successfully completed if applicable. Project proponents having no previous experience with similar projects should discuss any past experiences that may help show a capacity to successfully complete the project being proposed. This may include partnering with a more experienced organization that can provide project support.
 +
## Identify who will be responsible for tracking project expenses and maintaining project records in a manner that allows for a full audit trail of any awarded grant funds.
 +
# G. Budget
 +
## detailed project budget should be provided in an Excel spreadsheet attached to this grant application. The space provided here is to allow for a narrative description to further explain the proposed budget.
 +
## Explain how the grant funds, if awarded, will be spent to support the goals and objectives of the project. If equipment grant funds are requested, explain how the equipment will be utilized and maintained beyond the life of the grant.
 +
## Are the costs for each proposed activity reasonable for the geographic area where they are to be performed? Identify any costs that are higher than usual and explain any special circumstances within the project that makes these increased costs necessary to achieve the goals and objectives of the project.
 +
## Is the total project cost appropriate for the size, scope, and anticipated benefit of the project?
 +
## Identify all Indirect Costs and describe why they are necessary for a successful project implementation. Administrative expenses to be paid by the Fire Prevention Grants must be less than 12% of the total grant request (excluding equipment).
 +
## Explain each object category in detail and how that would support meeting the grant objectives.
 +
# H. California Climate Investments
 +
## The space provided here is to allow for a narrative description to further explain how the project/activity will reduce Greenhouse Gas emissions.
 +
## How will the project/activity reduce Greenhouse Gas emissions?
 +
## Is the project located in a Low-Income or Disadvantaged Community? If not, does the project benefit those communities. Please explain.
 +
## What are the expected co-benefits of the project/activity (i.e. environmental, public health and safety, and climate resiliency)?
 +
## When are the Greenhouse Gas emissions and/or co-benefits expected to occur and how will they be maintained?

Latest revision as of 16:46, 14 December 2018

Scope of work, working document

  • Project Name
    Expanding Butano Canyon Green Bin Days
  • Project Tracking Number
    18-FP-CZU-1140
  • Project Description Summary
    We will be expanding our quarterly Green Bin days to bi-monthly days. We will be proposing funding for the purchase of a chipper and additional dumpster rentals. We will be providing in-kind labor, fuel and maintenance donations. ok we need text such asButano Canyon is a community of # homes and # common buildings, including a water treatment plant. Residing in # acres adjacent to Butano Start Park, the canyon is in a designated High Fire Risk area. The Canyon has # residents who work in the surrounding community or along the southern reaches of San Mateo County. The community is a mix of permanent residents, renters, and part time occupants. This community is in a Low-Income region of San Mateo County.
    93 water connections, 88 houses. a drinking water treatment plant with 2 holding tanks and X feeder tanks
    WORK IN PROGRESS, JUST SKETCHING IDEAS
  • Scope of work Only one of these in a grant need be answered.
  1. Section 1: Hazardous Fuel Reduction/Removal of Dead or Dying Tree Projects
    1. Describe the geographic scope of the project, including an estimate of the number of habitable structures and the names of the general communities that will benefit.
      The Butano Canyon Municipal Water Company serves the 88? houses comprising the Butano Canyon community. The Community is located on the banks of Butano Creek, between Butano State Park to the south and private holdings to the north. Established at the turn of the 20th century, the community occupies about 238 ? acres of second growth Redwood forest.
    2. Describe the goals, objectives, and expected outcomes of the project.
      The Goal
    3. Provide a clear rational for how the proposed project will reduce the risks associated with wildfire to habitable structures in the WUI.
    4. Identify any additional assets at risk to wildfire that will benefit from the proposed project. These may include, but are not limited to, domestic and municipal water supplies, power lines, communication facilities and community centers.
    5. Is the scale of the project appropriate to achieve the stated goals, objectives and outcomes discussed in Item 2 above?
    6. How will the project/activity utilize the left over woody biomass? Will the project/activity use a biomass facility to reduce greater greenhouse gas emissions?
  2. Section 2: Planning Projects
    1. Describe the geographic scope of the project, including the communities that will benefit, and an estimate of the number of structures within the project area.
    2. Describe how the project will assess the risks to residents and structures in the WUI and prioritize projects to reduce this risk over time.
    3. Does the proposed plan add or build upon previous wildfire prevention planning efforts in the general project area?
    4. Identify a diverse group of key stakeholders, including local, state, and federal officials where appropriate, to collaborate with during the planning process. Discuss how the project proponent plans to engage with these targeted stakeholders.
    5. Describe the pathways for community involvement that will be incorporated in the planning process.
  3. Section 3: Education
    1. Describe the specific message of the education program and how it relates to reducing the risk of wildfire to owners of structures in the WUI.
    2. Describe the target audience of the education program and how information will be distributed to this audience.
    3. Will the education program raise the awareness of homeowner responsibilities of living in a fire prone environment?
    4. Identify specific actions being advocated in the education material that is expected to increase the preparedness of residents and structures in the WUI for wildfire.
    5. Describe the expected outcome of the education in terms of increased or changed public awareness about wildfire.
  4. B B. Relationship to Strategic Plans
    1. Does the proposed project support the goals and objectives of the California Strategic Fire Plan, the local CAL FIRE Unit Fire Plan, a Community Wildfire Protection Plan (CWPP), County Fire Plan, or other long term planning document? (Please type in blank space below. Please note there is no space limitations).
  5. C. Degree of Risk
    1. Discuss the location of the project in relation to areas of moderate, high, or very high fire hazard severity zone as identified by the latest Fire and Resource Assessment Program maps. Fire hazard severity zone maps by county can be accessed at: http://www.fire.ca.gov/fire_prevention/fire_prevention_wildland_zones_maps.php
    2. Describe the geographic proximity of the project to structures at risk to damage from wildfire in the WUI. (Please type in blank space below. Please note there is no space limitations).
  6. D. Community Support
    1. Does the project include any matching funds from other funding sources or any in-kind contributions that are expected to extend the impact of the proposed project?
    2. Describe plans for external communications during the life of the project to keep the effected community informed about the goals, objectives and progress of the project. Activities such as planned press releases, project signage, community meetings, and field tours are encouraged.
    3. Describe any plans to maintain the project after the grant period has ended.
    4. Does the proposed project work with other organizations or agencies to address fire hazard reduction at the landscape level?
  7. E. Project Implementation
    1. Discuss the anticipated timeline for the project. Make sure to take seasonal restrictions into account.
    2. Verify the expected timeframes to complete the project will fall under the March 15, 2022 deadline.
    3. Describe the milestones that will be used to measure the progress of the project.
    4. Describe measurable outcomes (i.e. project deliverables) that will be used to measure the project’s success.
    5. If applicable, how will the requirements of the California Environmental Quality Act (CEQA) be met?
  8. F. Administration
    1. Describe any previous experience the project proponent has with similar projects. Include a list of recent past projects the proponent has successfully completed if applicable. Project proponents having no previous experience with similar projects should discuss any past experiences that may help show a capacity to successfully complete the project being proposed. This may include partnering with a more experienced organization that can provide project support.
    2. Identify who will be responsible for tracking project expenses and maintaining project records in a manner that allows for a full audit trail of any awarded grant funds.
  9. G. Budget
    1. detailed project budget should be provided in an Excel spreadsheet attached to this grant application. The space provided here is to allow for a narrative description to further explain the proposed budget.
    2. Explain how the grant funds, if awarded, will be spent to support the goals and objectives of the project. If equipment grant funds are requested, explain how the equipment will be utilized and maintained beyond the life of the grant.
    3. Are the costs for each proposed activity reasonable for the geographic area where they are to be performed? Identify any costs that are higher than usual and explain any special circumstances within the project that makes these increased costs necessary to achieve the goals and objectives of the project.
    4. Is the total project cost appropriate for the size, scope, and anticipated benefit of the project?
    5. Identify all Indirect Costs and describe why they are necessary for a successful project implementation. Administrative expenses to be paid by the Fire Prevention Grants must be less than 12% of the total grant request (excluding equipment).
    6. Explain each object category in detail and how that would support meeting the grant objectives.
  10. H. California Climate Investments
    1. The space provided here is to allow for a narrative description to further explain how the project/activity will reduce Greenhouse Gas emissions.
    2. How will the project/activity reduce Greenhouse Gas emissions?
    3. Is the project located in a Low-Income or Disadvantaged Community? If not, does the project benefit those communities. Please explain.
    4. What are the expected co-benefits of the project/activity (i.e. environmental, public health and safety, and climate resiliency)?
    5. When are the Greenhouse Gas emissions and/or co-benefits expected to occur and how will they be maintained?